To the central content area

The Survey of the Soil and Groundwater Contamination in Yunlin County in 2019

Absrtact
The program of “The Survey of Soil and Groundwater Contamination in Yunlin county in 2019” has been operated for the environmental sustainability. The work involves groundwater monitoring wells maintenance and groundwater investigation in wet season, to supervise and verify pollution remediation of regulated gas stations, advertisement of gas station regulations, dealing with emergency cases, and administrative assistances. The plan had been executed from January 25th to December 10th 2019, and the results of implementation are summarized as follows: The county’s 18 field-based monitoring wells and EPA’s 60 regional monitoring wells have been inspected and the internal function have been checked. According to the inspection results, 13 monitoring wells were maintained, and 7 well monitoring wells were repaired. The well conditions of the 4 regional and 23 field-based monitoring wells were evaluated, and according to the results of the well conditions, 2 regional and 11 field-based monitoring wells were re-completed and 5 monitoring wells were excluded foreign materials. There were no suitable monitoring wells in the county for the implementation of well-sealing operations. The documents of the underground storage tanks and the online application data of 58 gas stations have been checked, and major flaws in violation of the regulations of 5 gas stations were found. The major errors the online application documents, such as coordinates, business license licenses, and automatic liquid level meter brands, all requested to be updated on site. The soil gas monitoring well (SGMW) of 5 gas station have been checked and all met regulatory standards. The Jiujing Beigang gas station and the Gongchun gas station, listed as the pollution B2 level III according to EPA’s gas station pollution potential category in 2018, have operated SGMW soil gas check 4 times in 2019. The results showed all met regulatory standards. The county now has a total of 2 remediation sites, 5 control sites, 7 7th article 5 sites and 2 groundwater restricted zones, and the project regularly conducts supervision and inspection of the site of the management according to the approved pollution site improvement plan. At present, all the pollution site improvement projects of the inspection results meet the requirements of the progress. Totally 5 pollution sites improvement completion verification have been operated, which were Zhangyuan Enterprise Co., Ltd., Yuhaoheng Co., Ltd., Mingru Industry Co., Ltd., Hesheng Automobile, and Deli Paper Co., Ltd. There were 13 cases of soil and groundwater people's sentiment and emergency response cases this year. The team of the project assisted in on-site sampling and analysis operations, and submitted the report on the results of the investigation within 10 working days. The project completed the review of the 3 gas station completion reports, and all the amendments have been completed and submitted to the EPA for verification. All regulated control tasks, declaration reviews, and administration assistances have been carried and fulfilled as the requirement of the contract. The plan completed the review of the first, second and third online reporting operations in the 2019 year of the gas station in February, June and October this year, and both reported the records, analysis and review. The reporting rate and review rate for this year have reached 100%. The industrial area implements the soil and groundwater pollution remediation law 6th Article 3 to regularly check the soil and groundwater data and reported online. The online data of 7 industrial zones in the first half of the year and the 3 industrial zones in the second half of the year have been reviewed by this project. During the year, the review work of the contaminated soil departure disposal plan submitted by Hesheng Automobile was completed and reviewed and approved by the company for future reference. Totally 20 of the soil pollution assessment survey and inspection data review work announced in Articles 8 and 9 of the Soil and Groundwater Pollution Remediation Law have been carried out in this year. The work is completed within the review period, and the check-lists are signed by environmental technicians. On April 10th, the program held the "Gas Station Regulations Propaganda and Declaration Practice Briefing", with a total of 82 participants. On August 13th, the "Analysis and Reporting Practices for the Article 8th and 9th Regulations on Soil and Groundwater Pollution Remediation Law" was held, and the number of participants was 115. The project has completed 10 "School Storytelling Activities" activities, including groundwater monitoring well photography and sampling demonstrations, soil and water pollution conservation announcements, and presentations and gifts for film and soil pollution books. The work team has completed all the evaluation work items and is also set by the EPD. Performance appraisal methods, assisting relevant appraisal projects to achieve the best appraisal performance.
Keyword
Soil,Groundwater,Gas station,Farmland
Open
top